Spektrum

Spektrum 2.9gram Linear Servo with Long Lead

Spektrum  |  SKU: SPMSH2040TL
$54.99
HOBBYTECH TOYS

Leave your email and we’ll let you know when this item is available again.

Spektrum 2.9gram Linear Servo with Long Lead

This is a notification only - Stock is not reserved or held for you.

Stock location: Supplier Warehouse
American Express Apple Pay Google Pay Mastercard PayPal Shop Pay Visa
Buy now, pay later

Pay with Zip

Select Zip at checkout to see the payment options available for your purchase.

Learn more about Zip
Free Shipping Over $250+

Free Shipping Over $250+

Free Shipping:

Free freight applies to the following online orders:

Orders over $250.00

Orders that exclude items marked "Oversize"

Orders that exclude items marked "Dangerous"

  • Shipping cost will be automatically calculated on checkout.
  • Orders will be shipped via Australia Post or Team Global Express.
  • Insurance may be requested on parcels at an additional cost per consignment. Hobbytech will not be held responsible for any losses or damages caused by chosen freight forwarder. All disputes must be taken up with the freight forwarder directly.
  • No deliveries will be done outside of Australia.
  • By placing your order on the Hobbytech website or via e-mail/telephone/website you accept all the shipping terms listed above.
30 Day Returns Policy

30 Day Returns Policy

Warranty/ Faulty: Refund or Exchange

If you are having trouble with any of your purchases, and suspect it could be a warranty issue, then please email or phone us to go through your item's history of use and background. We are very reasonable when it comes to faults, and will try and resolve any concerns you have as quickly and painlessly as possible.

Each product is covered by the respective manufacturers warranty policy and some products may have individual components that are covered by separate warranties and time frames. We do not offer any additional product warranties outside the manufacturer’s warranty.

Please discuss any warranty concerns with us before sending the items back to avoid any confusion and unnecessary costs. We will generally require you to send photos of the product with your purchase details for an initial assessment and we will go from there.

Postage costs will be at the returner’s expense and refunded if the product is proven to be covered by warranty.

If the product is required to be sent back to our suppliers for assessment, we will cover this cost.

We will always try to resolve any warranty concerns as quickly as possible, where any delay is incurred we will communicate this to you.

  • A warranty refers to any new product which has a manufacturing defect or a major failure within a reasonable period.
  • If the warranty relates to a minor failure then we may replace, repair or refund the item.
  • On assessment if the product is deemed as having a major failure, the customer can decide whether they would like a replacement, repair or refund.
  • A warranty does not apply to any wear and tear on a product, crash damage or a product being used outside it’s intended use.

 

For further information, please refer to https://www.accc.gov.au/consumers/consumer-rights-guarantees/repair-replace-refund

Posting Returns

When sending items back for exchange, refund, repair or warranty assessment please post to our main office at the following address:

Hobbytech Toys

18/276 Leach Highway

Myaree

WA

6154

Product details

Spektrum 2.9gram Linear Servo with Long Lead is a Spektrum rc servo or servo replacement component for hobby-grade radio control applications.

Provides steering, throttle or control-surface movement in a compatible RC installation.

Compatibility: Designed for RC applications that match the servo dimensions, spline, voltage, torque and speed requirements. Always compare the manufacturer part number, dimensions, connector type and electrical specification with your model before ordering.

  • Brand: Spektrum
  • Part number: SPMSH2040TL
  • Product type: RC servo or servo replacement component
  • Application: RC applications that match the servo dimensions, spline, voltage, torque and speed requirements

Special order item: This product is ordered from our supplier after purchase. Supplier availability and lead times can vary.

Frequently Asked Questions

How long does order processing take?

Most orders received before 14:00 are shipped out the same day.

How long will it take to receive my order?

Depending on where you are located - Standard shipping normally takes 3-5 days.

Where is Hobbytech Toys Located?

Hobbytech Toys is located at Unit 18, 276 Leach Highway, Myaree, Western Australia, 6154

Store Opening Hours

Hobbytech Toys is Open Monday - Saturday 09:00 -17:00 & Sunday + Most Public Holidays 11:00 - 17:00.

We are closed on New Years Day, Australia Day, Anzac Day & Christmas Day.